The iron law of "three prohibitions" (violation must be reworked)
1. Do not use current beyond the nameplate
Painful case: A 630A isolation switch with an 800A load in a certain factory caused a phase to phase short circuit due to contact welding
Hardcore control:
? Current calculation formula: Load current ≤ switch rated current × temperature coefficient × altitude coefficient
-Temperature coefficient Kt: 0.85 for 40 ℃ environment (GB/T 1985)
-Altitude coefficient Ka: 1% decrease per 100 meters per liter above 1000 meters
? Verification Example:
800A load/altitude 1500m → switch selection required ≥ 800 ÷ (0.85 × 0.95) ≈ 990A
2. Do not ignore grounding
Fatal error: Grounding resistance>10 Ω, insulation breakdown due to counterattack voltage during lightning strike (a wind farm lost 2 million yuan)
Compliance skills:
-Grounding body selection: Galvanized flat steel ≥ 40 × 4mm 2 (corrosion zone thickened by 20%)
3. Do not omit the opening and closing signs
Blood lesson: A substation misjudged the opening state and caused arc burns during loaded operation
Error prevention design:
? Mechanical indication and rigid linkage of contacts (rejecting soft connections)
? Mandatory differentiation of the base color of the sign:
-Opening: Yellow background with black letters
-Closing: Red background with white letters
? Night work requirements: Self luminous signs (LED backlight or fluorescent coating)
Five check checklist after installation (20 minute quick self check)
First check: Contact point contact (lifeline)
-Contact pressure: The clearance between the contact fingers measured by a feeler gauge is ≤ 0.05mm (630A level)
-Contact resistance: measured by a micro ohmmeter, ≤ 120 μ Ω (if exceeding the standard, the contact surface needs to be polished)
-Heat warning: stick 70 ℃ thermal sensitive test paper (if it changes color after running for 1 hour, it is unqualified)
Second check: Locking function (anti misoperation)
-Mechanical locking: When the grounding knife is closed, the main knife switch operating hole is physically locked (verified by inserting a Φ 20 pin rod)
-Electrical lockout: Simulate the closing signal of the circuit breaker and measure the output resistance of the lockout relay to be greater than 10k Ω
Third check: Insulation resistance (life symbol)
-Test conditions: humidity ≤ 70%, otherwise heating and dehumidification are required
-Qualification criteria:
Location | Megohmmeter voltage | Minimum value |
Between fracture surfaces | 2500V | ≥ 1000M Ω |
Charged body to ground | 2500V | ≥ 500M Ω |
Fourth check: Operating torque (anti refusal to move)
-Torque upper limit: Manual operating lever ≤ 200N · m (lubrication of the shaft is required for exceeding the limit)
-Operation trajectory: The deviation of the opening and closing angle monitored by the laser level is ≤ 1 ° (e.g. GN19-10 should be 88 °± 1 °)
Fifth check: Institutional status (extended lifespan)
-Opening in place: contact opening distance ≥ 180mm (indoor type)
-Buffer check: The sound of closing impact is dull → Check the oil buffer level (if it is insufficient, add 45 transformer oil)
---
Cracking plan for rework in severely affected areas
1. Contact overheating (accounting for 60% of rework)
-Incorrect practice: Sandpaper polishing the surface of the fingers (damaging the silver plating layer)
-Correct process:
1. Anhydrous ethanol cleaning
2. Silver based conductive paste filling micro depressions
3. Contact pressure retest ≥ 40N/cm 2
2. Ground resistance virtual drop
-False standard trap: Resistance reducing agent wraps around the grounding body but does not fully integrate with the soil
-True solution:
-Excavation depth ≥ 0.8m
-Resistance reducing agent: water: soil=1:1:3 mixed backfill
-Retest in 3 days (after stable water infiltration)
3. Switching on and off at different stages
-Quick calibration:
1. Remove the linkage rod
2. Unipolar adjustment of crank arm angle (calibration of laser angle meter)
3. After reinstallation, the three-phase different periods should be ≤ 2mm
Acceptance must pass the checklist
1. Prepare three sets of documents:
-Factory test report (including records of power frequency withstand voltage of 42kV/1min)
-Installation process image (focusing on capturing contacts and grounding connection points)
-Torque wrench calibration label (within validity period)
2. Five tricky questions to deal with supervision:
-How to prove that the contact pressure meets the standard? "→ Present a photo of the pressure sensing film color spot
-How to prevent corrosion of grounding grid? "→ Display hot melt welding points+anti-corrosion asphalt coating
-How to adjust the overtravel? "→ The measured insertion depth of the plug gauge contact is ≥ 10mm
Remember: By following the "three prohibitions" and "five inspections", the acceptance rate can reach 100%. After applying this method, the rework rate of a certain provincial power transmission and transformation company decreased from 38% to 0!
Oil&Gas exploited
Automotive Manufacturing
Transportation & Dlistrlbutlon
Manufacture
Industrial Construction
Green Energy
Copyright ? 2024 All Rights Reserved
Back to top
Comment
(0)